Buying guide

Private label or new development: which route to take


Private label, ODM adaptation and full OEM development are three different orders with three different cost structures, and the difference is where the design comes from. This guide sets out what each one actually buys you, which suits which product, and — the part that is usually left out — what changes at the reorder depending on which one you chose.

The distinction

The difference is where the design comes from

All three routes use the same factory, the same materials and the same inspection routine. What changes is who supplies the design, and that single question decides your tooling cost, your first-order minimum and how long the product takes to reach the shelf.

Private label

You select a construction that already exists. Your branding goes onto the product and the packaging, and the first sample is a presentation sample rather than a development round. Nothing is designed and nothing is tooled, so the order is fast and the minimum is low.

The trade-off is differentiation. Someone else can buy the same construction and put their own brand on it tomorrow, because the shape is not yours.

ODM adaptation

You start from a construction the factory develops and change named elements — colourway, fabric, size, trim, sound device, or specific detail on the shape. There is pattern work, so there is at least one revision round, and the result is a product that is recognisably related to the original but is not the same product.

The trade-off is a middle position on both cost and differentiation: cheaper than a new shape, more distinctive than private label.

OEM development

You supply the design. The factory develops the pattern, samples it, revises it with you and produces to a signed sample. This is the only route that produces a shape nobody else carries, and the only one where the design belongs to you outright.

The trade-off is time and money at the front of the project, particularly where the construction is moulded and needs a tool before anything can be sampled.

Side by side

The five things that actually differ

Price per unit is the least useful column in a comparison like this, because it is a consequence of the other five.

How the three routes compare on the questions that decide a sourcing decision.
Question Private label ODM adaptation OEM development
Who designs it The factory. You choose from what exists. The factory, with your changes applied to named elements. You do. The factory turns it into something manufacturable.
Development work None. Branding and packaging only. Pattern work on the changed elements, usually one or two rounds. Full pattern or tooling development, with revision rounds until you sign.
Sample you receive first A presentation sample in your branding and packaging. A soft sample of the adapted construction, then a production sample. A soft sample from your design, then a production sample.
What drives the minimum Colourways, size splits, branding method and packaging format. Those, plus the pattern work and any new fabric. Those, plus tooling where the construction is moulded.
Who owns the design The factory owns the construction; you own the brand. Established per project, and stated in the quotation rather than assumed. You own the design. The pattern is developed for you and is part of what the order pays for.

Choosing

Which route suits which product

Most ranges use more than one. The question is not which route is right for the business, but which is right for each product in it.

Volume lines: private label

The products that carry a range's volume usually do not need to be distinctive — they need to be good, repeatable and cheap. Paying for a new shape on the line you sell four units of per day is development budget spent on the wrong product.

A hero product: OEM

The product on the front of the catalogue, the one in the campaign, the one a competitor cannot copy — that is where development spend earns its place, and where owning the design has a value beyond the first order.

Seasonal ranges: adaptation

A dated range usually needs to look new without carrying tooling that only sells for six weeks. Recolouring and re-detailing an existing construction gives a seasonal look without a seasonal development cost.

Testing a category: private label

If you are not yet sure a category will sell, buying it from an existing range tells you whether the demand is there before you commit development budget to it. The cost of being wrong is then a purchase order, not a tool.

Moulded products: think earliest

A moulded construction needs a tool before anything can be sampled, and the tool has to be paid for across the first order. Where a shape already exists in the range, adapting it is a far smaller commitment than cutting a new one.

A first order with a new supplier: private label

Starting a relationship with a development project means learning how a supplier works at the same time as they are learning your standard. A private label first order tests the packaging, the documentation and the shipping without adding a design process on top.

In one range

How the routes sit together

A range that mixes routes is normal, and it is usually the most efficient answer. What matters is that the mix is deliberate and documented per SKU, because that is what keeps one range presenting as one brand.

One packaging standard covers all of them

The route a product took is invisible to the shopper. A single card format, label position and carton scheme applied across private label and developed products is what makes them read as one range.

Specification sheets are per SKU, not per project

A developed product and a private labelled one are specified differently, so the sheet has to describe which route applies. One sheet for the whole range produces a reorder that guesses.

Release dates differ

Private label lines can be ordered while a developed product is still in revision. Sequencing the range so the easy lines ship first gets the shelf filled while the hero product finishes development.

Minimums are per construction

A range minimum is the sum of its SKU minimums, and each SKU's minimum depends on the route and the construction. That is why a range budget is built line by line rather than from an average price.

At reorder

What changes on the second order

The route you chose on the first order determines what the second one costs you in effort. This is the part of the decision that is easiest to miss, because it arrives a year later.

Private label

The reorder repeats from the specification sheet and the approved sample. There is nothing to re-decide, and the main risk is a fabric being discontinued — which is raised before production rather than discovered in the carton.

ODM adaptation

The reorder repeats the adapted pattern, so it behaves like a private label reorder once the adaptation is signed. The one thing to keep is the record of what was changed from the original, in case the original is later revised.

OEM development

The reorder repeats your own design from your own pattern. That is the strongest position to reorder from, and the reason development cost is worth thinking of as an asset rather than an expense — provided the design and the pattern are yours.

Whichever route a product takes, the mechanism is the same: a signed sample and a specification sheet that a reorder can be built against. Where one of those is missing, the second order is a new interpretation regardless of the route.

Next

Where this guide leads

The route decides the shape of the project; the next two guides cover the brief that starts it and the minimum you will be quoted for it.

How the service pages divide

What can be branded, how the arrangement works, and what moves the minimum and the sampling date on a private label order.

Private label pet toys

What a development project involves

The three kinds of sample, the six stages from brief to bulk, and what actually drives the number of revision rounds.

Sampling and product development

Running a private label programme

Building a multi-SKU own-brand range on one packaging standard and repeating it on reorder.

Private label buyer guide

Tell us the product and we will name the route

Send what you are trying to build and the volume you expect. You will get back which route suits it, the applicable minimum, the sampling date and what the development work would consist of. Related reading: all buying guides and the OEM and ODM overview.